Profile
 |
This 50,000 SF
commercial space required the installation of four
(4) large bathrooms consisting of six stalls in
each bathroom and two (2) single use bathrooms.
All bathrooms met ADA requirements. MSI installed
Bradley sinks in the production area and a
compressed air piping system for air lines
throughout the entire building to run the
machinery and tools. MSI also piped in a 5"
gas main and a 12" storm drain system. This
building also required the installation of a
4" water main with backflow preventers.
|
|
|
|
Design Team
Owner:
Prattville Machine & Tool
Mechanical Engineer:
TWB Associates, Inc
General Contractor:
Trace Construction Inc
|
|