Profile
 |
MSI installed all
storm drains, sanitary drains and kitchen waste
drains for this 45,000 SF project. The sanitary
drain work included coordinating and scheduling
with site excavators to install 15" storm
drains. Kitchen waste drains involved the
installation of underground grease traps, several
floor sinks and floor drains. The installation of
the sanitary system was designed for several gang
bathrooms. Through the proper coordination and
planning, over 150 penetrations through the slab
were made with 100% accuracy.
|
|
|
|
Design Team
Owner:
Simplex Time Recorder
Mechanical Engineer:
R.G. Vanderwell
Engineers Inc General Contractor:
William A. Berry &
Son Inc
|
|