 Project
  Simplex Time Recorder - 
  Underground


 Location
   Westminster, MA
 
*** Click here to view customer testimonial
Type
 Manufacturing Facility

Size
 45,000 sq ft
Trade
 Plumbing
 
Project Photo
Main
 
Project Photos Directions
Map Quest
 Profile
MSI installed all storm drains, sanitary drains and kitchen waste drains for this 45,000 SF project. The sanitary drain work included coordinating and scheduling with site excavators to install 15" storm drains. Kitchen waste drains involved the installation of underground grease traps, several floor sinks and floor drains. The installation of the sanitary system was designed for several gang bathrooms. Through the proper coordination and planning, over 150 penetrations through the slab were made with 100% accuracy.

 
Design Team
 Owner:
  Simplex Time Recorder

 Mechanical Engineer:
  R.G. Vanderwell Engineers Inc

 General Contractor:
  William A. Berry & Son Inc